Construction Management

Mercy Medical Center

Replacement Clinical Tower Baltimore,Maryland

 
line decor
  
line decor
Home
About Nicole
Building Statistics
Thesis Abstract
Technical Assignments
Thesis Research
Thesis Proposal
Presentation
Final Report
Reflection
E-Studio

 

User Note:

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Nicole C. Jenkins. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 
 


Technical Assignments

Technical Assignment 1

Technical Assignment 1 focuses on the existing conditions of the building. It takes a detailed look at the site plan, the project schedule, project cost, local conditions, client information, the project delivery and the staffing plan.

Technical Assignment 2

Technical assignment 2 focuses on the cost aspects of project a well as the scheule of the project.

Technical Assignment 3

   Technical assignment 3 main focus is to showcase a series of issues that can be analyzed in the building. This is a precursor to the proposal assignment where the topics discussed will be refined and analyzed with more detail.   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Senior Thesis | The Pennsylvania State University|Architectural Engineering|AE Lab|NSBE|Research|Contact Nicole

This Page was last updated on December 18, 2007 , By Nicole C. Jenkins and is hosted by the AE Department ©2007